katriceervin12p8wls8 katriceervin12p8wls8
  • 02-05-2020
  • Mathematics
contestada

If it takes 12 weeks for the factory to be at full capacity, how many weeks would it take for the factory to be at half capacity?

Respuesta :

jam2282
jam2282 jam2282
  • 02-05-2020

Answer:

it takes 6 weeks fir the factory to be at half capacity

Step-by-step explanation:

half of 12 is 6

Answer Link
jojiwalt
jojiwalt jojiwalt
  • 02-05-2020

It would take 6 weeks to be at half capacity

Answer Link

Otras preguntas

What is the value of the expression 25m−13 when m = 3?
Kitty was a trusted friend to Anne elaborate
Once a truckload of wheat has been​ weighed, title passes to the buyer. A. True B. False
Each verbal expression or equation contains highlighted words that correspond to a mathematic operation. Drag a tile to match each highlighted word or phrase.
what if an atoms protons electrons and neutrons are all different?
Which two plants with psychoactive properties were known to be used for medicinal purposes in ancient egypt? a. the poppy and the blue lotus b. cannabis and the
Kaylee came up with a input/output table that she believed do not have a rule. Do you think Kaylee is correct? Explain your thinking.
C:Windows Home user a Leg file(file) Status Report (report Identify the rootdrrectory ||| In Identify the name of the drive. 3 Identify the subdirectory of the
Test plans require input from both end users and information systems specialists. a. trueb. false
"sex limited genes are:"