ntufgq6wv5
ntufgq6wv5 ntufgq6wv5
  • 04-02-2021
  • Mathematics
contestada

Workers at a quarry are removing rock at a daily rate of 0.1%. There are 3.2 tons of rock when the work begins.
Which function can be used to find the number of tons of rock left at the end of d days?

Workers at a quarry are removing rock at a daily rate of 01 There are 32 tons of rock when the work begins Which function can be used to find the number of tons class=

Respuesta :

samreenkaur66 samreenkaur66
  • 12-02-2021

Answer: C

Step-by-step explanation:

use the x and y

Answer Link
002235 002235
  • 09-03-2021

Answer:

c

Step-by-step explanation:

Answer Link

Otras preguntas

What three islands are located off the East African coast
Does the depth of a pan affect how water freezes?
How does transpiration play a  role in the water cycle ?
Solving systems by elimination: 2x + 4y = -4 3x + 5y = -3 Please show me your work so I can do the rest myself. Thanks!
in an expression(8/9) squared (-81)+3/5dividedby-9/10
A passenger on a boat moving at 1.70 m/s on a still lake walks up a flight of stairs at a speed of 0.60 m/s , as shown in the figure . The stairs are angled at
What is a direct combination reaction?
How is the numeral 35.012 written in words and why
Nadine can send or receive a text message for 15 cents or get an unlimited number for 5 dollars. Write and solve an inequality to find how many messages she can
If the speed of an object is tripled, its kinetic energy will be