What action is often necessary when installing joists for a cantilever floor?

Respuesta :

idegollacion20
idegollacion20 idegollacion20
  • 14-04-2018
A cantilevered floor is a kind of floor that pops out past the foundation wall below.  Start the joist layout from the longest and strongest run the house or building has. You should also lay floor joists on the stairway's opposing side. Also, remember the 2/3 rule for framing cantilever joists. This means that twice the joist's length should remain inside the structure while the rest sticks out.
Answer Link

Otras preguntas

In 1775, the population of the colonies included about _______ African slaves. A. 100,000,000 B. 500,000 C. 50,000 D. 100,000
Prove that the product of two odd numbers is always odd.
Marcus makes a punch that is 1/4 cranberry juice. write 2 fraction that are equivalent to 1/4
what does employ mean
Ideas to write about an antique gallery? Can there be chairs in a gallery?
Robert needs to cut four shelves from a board that is 2.5 meters long the second shelf 18 centimeters longer than twice the length of the first shelf the thrid
In which of the following regions has the United States been militarily involved, in the 1990s and into the early decades of the new millennium? A. China B.
Which is not under the direct control of human manipulation? A. natural selection B. DNA engineering C. genetic engineering D. selective breeding
the value of the expression 6+5(3)/4-10is
how have third parties been important in american history